Trim and Finish Details
Throughout this stage, you will begin to see the home you designed come to life.
- Walls are prime-painted and prepared for final finish. Interior trim, cabinets, counters and sinks are installed.
- Electrical system is completed. Installation of wire shelving, bath accessories and mirrors occurs.
- Tile and any vinyl and/or wood flooring is installed. Weather permitting, any necessary grading occurs outside. Carpeting, hardware fixtures and shoe molding are installed.
- Final touches are made as the entire home is cleaned.
Quality Checkpoint:
Interior trim in inspected for fit and quality of installation. HVAC systems are finished as a pre-final quality check focuses on all completed areas of the home. Pre-final quality review of entire home takes place.